HETHERINGTON’S PAINTING & BUILDING CONTRACTORS / COMMERCIAL

22 Foygh Rd / Dungannon / BT70 3PH

Based in Donaghmore since 1985, HPBC specialise in ECM planned maintenance, social housing, regeneration and large-scale painting contracts.


PROJECT DURATION

3 MONTHS

Based in mid-Ulster, HPBC has expanded its headquarters with an additional c.200 sqm modular office block. Adjacent to its main office building, the new modular building consists of seven offices and a meeting room.

Mac Zero constructs 200m² modular building for HPBC

PROJECT INFO

Delivered in under three months, this high-quality modular extension has significantly expanded HPBC’s main site. Designed with performance and longevity in mind, the new facility is airtight, energy-efficient and future-ready, providing a modern, sustainable workspace.

Aesthetically, the extension makes a bold statement. Finished in striking Equitone Pictura cobalt blue and Equitone Natura anthracite slate, the building complements the existing structure.

M&E PROJECT SPECIFICATIONS

Heating - Plumbing, ventilation and installation of an Air Conditioning heating and cooling system. Room controls have been installed with ease of use in mind.

Building Ventilation - Ventilation has been provided with the use of Daikan MVHR units within the ceiling voids.

Efficient LED light fittings throughout with programmable PIR presence detection sensors.

CCTV cameras throughout building, connected to main building security system.

  • Faster construction

  • Minimal disruption

  • Scalable, flexible, customisation

  • Exceptional quality

  • Lower costs

Modular solutions for commercial businesses offer:

EAMONN CUSHNAHAN

DIRECTOR / BLACKBIRD ARCHITECTURE

“Working with Mac Zero on this project was an excellent experience throughout. Their team were professional, collaborative, and highly responsive from design development through to installation.

The speed of delivery, quality of finish, and minimal disruption to the client’s operations made the modular approach a real success, and the completed extension complements the existing offices exceptionally well. We would not hesitate to work with Mac Zero again in the future.”

Please enter your email below to download Mac Zero’s HPBC Case Study

Previous
Previous

BEAUFORT COLLEGE