OVO ARENA WEMBLEY / COMMERCIAL
Arena Square, Engineers Way, Wembley Park, Wembley, HA9 0AA
One of the most iconic venues in the UK required a nine-section modular building to create new, modern facilities for its crew.
PROJECT DURATION
9 WEEKS
A low-carbon in-operation modular building that was uniquely designed for underground use.
Mac Zero constructs 280m² modular building for Ovo Arena.
PROJECT INFO
Commissioned by one of the most iconic venues in the UK to create new, modern facilities for its crew, Mac Zero Modular Buildings has just designed, fabricated and installed a nine-section modular building at Wembley Park.
Designed to provide crew catering and canteen facilities for the Ovo Arena area, the 280m² modular building is unique in its design due to the building’s placement in Wembley’s underground village.
Each section of the new building was purpose-built to house the following specific functions: Welfare Facility and Storage Area, Entrance/Reception Area, Kitchen/catering facilities and Canteen Area.
The project involved the transportation of the nine section 280m2 building across the Irish sea. The 450-mile journey took two days and Mac Zero carried out the management and coordination of all logistics, including access permits and compliance with road regulations.
With installation required in a high-demand operational environment at the Arena, each module was carefully escorted in, offloaded, and installed to avoid any disruption to programmed events and ongoing activities. The installation included fitting, utilities connection and internal systems setup.
“The 280m² building was manufactured offsite, with the project taking just 9 weeks from start to completion.”
M+E PROJECT SPECIFICATIONS
Air Conditioning - offering both cooling and heating.
Mechanical Ventilation with Heat Recovery.
Recirculating filtration Tower System - to maximise energy efficiency within the kitchen area of this install.
Ansul Kitchen Fire Suppression System - Designed for commercial kitchens to rapidly detect and suppress grease fires.
Plumbing - Boosted cold water is provided to this modular building via the mains supply within the complex. Energy efficient electric water heaters installed.
Lighting - Bespoke energy efficient lighting installs.
JAY PANCHAL
PROJECT DIRECTOR, MOTION PROJECT MANAGEMENT
“The team were very proactive from the beginning of the project. The client had requested a lot of changes during the design stage, which they actioned very quickly to keep to their internal programmes. The on-site construction was extremely quick, and the end-product is just what the venue requested.